25/12/2002B.Botchine PNPI MUON CHAMBER FACTORY for LHCb experiment B.Bochin December 25,2002
25/12/2002B.Botchine LHCb
25/12/2002B.Botchine
25/12/2002B.Botchine
25/12/2002B.Botchine
25/12/2002B.Botchine
25/12/2002B.Botchine TDC efficiency for double-gap and four-gap modes Beam in the center of pad 11 = 0 mrad Beam intensity 50 kHz Thresh= 30mV 20ns (15ns) gates in TDC_AB and TDC_CD spectra Logical OR of AB||CD
25/12/2002B.Botchine ПИЯФ УЧАСТВУЕТ В РАЗРАБОТКЕ ПИЯФ УЧАСТВУЕТ В РАЗРАБОТКЕ И ИЗГОТОВЛЕНИИ МЮОННОЙ СИСТЕМЫ LHCb LHCb ДОЛЖНО БЫТЬ ИЗГОТОВЛЕНО 400 МЮОННЫХ КАМЕР
25/12/2002B.Botchine PNPI Muon Chamber Factory
25/12/2002B.Botchine PNPI Muon Chamber Factory
25/12/2002B.Botchine PNPI Muon Chamber Factory
25/12/2002B.Botchine PNPI Muon Chamber Factory.Jan 2002
25/12/2002B.Botchine PNPI Muon Chamber Factory.Jan 2002
25/12/2002B.Botchine The whole assembling area will be ready for tooling installation in Jan 2003
25/12/2002B.Botchine TOOLING *Bar glueing machines *Wiring machine *Soldering machine *Wire pitch&tension measuring machine Основное оборудование для сборки мюонных камер изготавливается в CERNе с участием наших инженеров и механиков
25/12/2002B.Botchine CERN Muon Chamber Assembling Area
25/12/2002B.Botchine CERN Muon Chamber Assembling Area
25/12/2002B.Botchine CERN Muon Chamber Assembling Area
25/12/2002B.Botchine Plans for tooling Tooling should be ready in March 2003
25/12/2002B.Botchine Technology chain
25/12/2002B.Botchine Muon Chamber Production Plan 30 M3R4 chambers in M3R4 chambers in M2R4 chambers in M2R4 chambers (spare) in 2006