НАУЧНАЯ СЕССИЯ ОТДЕЛЕНИЯ ФИЗИКИ ВЫСОКИХ ЭНЕРГИЙ 27 декабря 2011 Проект CMS в 2011 В.Сулимов 27.12.20111.

Презентация:



Advertisements
Похожие презентации
Сессия Ученого Совета ОФВЭ, 29 декабря 2005 Проект CMS в 2005 Ю.М.Иванов.
Advertisements

In America Unemployment Why does the government collect statistics on the unemployed? Why do we care?
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v Integrating Internet Access with MPLS VPNs Implementing Separate Internet Access and VPN Services.
© 2005 Cisco Systems, Inc. All rights reserved. BGP v Customer-to-Provider Connectivity with BGP Understanding Customer-to-Provider Connectivity.
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v Complex MPLS VPNs Introducing Central Services VPNs.
© 2006 Cisco Systems, Inc. All rights reserved. BCMSN v Introducing Campus Networks Network Requirements.
The role of English language in the modern life Tchegoleva Nastya, 10 a 2010.
© 2002 IBM Corporation Confidential | Date | Other Information, if necessary November 4, 2014 Copyright © 2006 Eclipse Foundation, Inc., Made available.
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
MSC.Patran 2005 R2 Support of ABAQUS ODB Results on HPIPF January, 2004.
By Łukasz Mazurkiewicz & Michał Mazurkiewicz
© 2006 Cisco Systems, Inc. All rights reserved.BCMSN v Defining VLANs Correcting Common VLAN Configuration Errors.
Manakova Svitlana 11-A According to research by experts in the field of education the best way to train - it is away from home, from the city, with an.
© 2005 Cisco Systems, Inc. All rights reserved. BGP v Customer-to-Provider Connectivity with BGP Connecting a Multihomed Customer to Multiple Service.
© 2005 Cisco Systems, Inc. All rights reserved. BGP v Route Selection Using Policy Controls Using Multihomed BGP Networks.
© 2006 Cisco Systems, Inc. All rights reserved.ISCW v IPsec VPNs Cisco High Availability Options.
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v Integrating Internet Access with MPLS VPNs Implementing Internet Access as a Separate VPN.
Moscow Project work. Aims 1.To prove that in the schools of the future dozens of various devices will be used in every classroom. 2. To carry.
Linux Daemons. Agenda What is a daemon What is a daemon What Is It Going To Do? What Is It Going To Do? How much interaction How much interaction Basic.
The preservation, strengthening and development of physical health through the school website Kandalaksha school 19 Кандалакша.
Транксрипт:

НАУЧНАЯ СЕССИЯ ОТДЕЛЕНИЯ ФИЗИКИ ВЫСОКИХ ЭНЕРГИЙ 27 декабря 2011 Проект CMS в 2011 В.Сулимов

The CMS Collaboration 3381 scientists and engineers (including ~840 students) from 173 institutes in 40 countries ~ 1/4 of the people who made CMS possible

The Standard Model at 7TeV

LHC Performance in

5 Event shown above has 13 reconstructed vertices

Muon Subsystem

Status Muon Subsystem ME1/ ×0.5 m² ME1/ ×0.8 m² ME1/ ×0.9m² ME 2/ ×1.25 m² ME3/ ×1.25 m² ME4/ ×1.25m² ME23/ ×1.3m² ME4/ ×1.3m² 473 CSCs (cover about 6000 m² ) **6 anode wires anode readout channels cathode readout channels

CSC status at the end of LHC proton run CSC demonstrated high efficiency in But without access to the chambers we cannot improve it

CSC real run efficiency HV Distribution board died D-link board failure caused loss of the configuration for a few chambers D-link board failure caused loss of the configuration for a few chambers

Preparation for stable running in 2012 LV 1. Replacing 3.3 V fuses on the TMB boards. 2. Connectivity test of 7 V lead to the on-chamber electronics. HV 1. Implement new protocol of the DCS- HV server communication. 2. Increase threshold for HV current trips in the inner ME rings. EPROM reloading 1. Automate EPROM downloading procedure. 2. Test of an effect of regular refreshing of the EPROM contents

Losses of on-chamber electronics We have lost only 1 ALCT in It was not unexpected. This ALCT didnt have JTAG communication since 2009 and as soon as EPROMs lost firmware the board has been lost. 2. The accumulated rate of dead CFEBs is 7 boards a year. The reasons are different (CFEBs, LVDB, cables). Right now we have 32 dead CFEBs.

CSC raises the threshold for HV trip current

После 2 лет стабильной работы CSC сталкивается с другой проблемой: без доступа к детектора мы должны обеспечить стабильную работу CSC в течении еще одного года в условиях повышенной светимости LHC

I ISR

Shifts in 2011 General Requirement for 2011: 6 points per Author PNPI participates in Trigger and DCS Central shifts shifts (94.5 shift-points). CSC DQM shifts shifts (6 weeks)

CSC Upgrade I Original design unfinished – ME4/2 not built 72 ME4/2 chambers to complete system Identical to chambers already built and working well Increase redundancy of system Efficient triggering at high luminosities

ME4/2 Upgrade R&D Production of 31 CSC

CSC Production Plans Assembly in B904 factory at CERN Currently being renovated – occupancy end of 2010 ~1000 m 2 space with good services CERN will provide two clean rooms for CSC Shipped tooling and parts from Fermilab Parts for approximately 3 prototypes + spares Shipment has arrived in B904 Plans for 2011 Plan to set up machines in January – February 2011 Then produce 2-3 prototypes as part of a learning curve (debug systems and train personnel)

CSC tooling in B

ME4/2 Upgrade

ME4/2 Upgrade

ME4/2 Upgrade

ME4/2 Upgrade

ME4/2 Upgrade