MARIS ECDIS900 - Type Specific Training Revision: ECDIS Issue No. 1, December 2013 Page 1
Revision: MARIS ECDIS900 Issue No. 1, December 2013 Page 2 7. FINAL EXERCISE Balder to Slagen Oil Terminal
Revision: Issue No. 1, December 2013 Page 3 MARIS ECDIS900 – 7.Final Exercise - Balder to Slagen Oil Terminal Task 1: Set data for ship parameters Task 2: Set route parameters.
Revision: Issue No. 1, December 2013 Page 4 MARIS ECDIS900 – 7.Final Exercise Task 3: Create a route Balder to Ferder by keyboard and enter the following waypoints from Balder to Ferder pilot station: Wp 1 LAT N LON E Wp 2 LAT N LON E Wp 3 LAT N LON E Wp 4 LAT N LON E Wp 5 LAT N LON E Wp 6 LAT N LON E Wp 7 LAT N LON E
Revision: Issue No. 1, December 2013 Page 5 MARIS ECDIS900 – 7.Final Exercise Task 4: Create a temporary route for costal navigation with pilot onboard from Ferder pilot station to Slagen Oil Terminal. Name it Slagen in. Use the cursor tool. Task 5: Create a third route - Link two routes: Balder to Ferder and Slagen in. Name Balder to Slagen terminal.
Revision: Issue No. 1, December 2013 Page 6 MARIS ECDIS900 – 7.Final Exercise Task 6: Select ENC (create working folio) for the Balder to Slagen terminal route. Task 7: Create a user data file, name it Slagen in 15 meter, with layers: 1.Parallel index and create one parallel index 2.No Go Areas and create one no go area 3. Go Areas and create one go areas Task 8: Link user data file Slagen in 15 meter to the route file Balder to Slagen terminal. Task 9: Perform route checking and highlight any grounding risk.
Revision: Issue No. 1, December 2013 Page 7 MARIS ECDIS900 – 7.Final Exercise Task 10: Check the weather through the route Task 11: Prepare Voyage plan. Add required information for the whole route. Preparation before departure: Task 12: Check operation of ECDIS. Task 13: Verify and check anti grounding alarm levels Task 14: Activate route and guard zone alarms. Task 15: Activate ECDIS logbook, set interval to 15 sec
Revision: Issue No. 1, December 2013 Page 8 MARIS ECDIS900
Revision: Issue No. 1, December 2013 Page 9 MARIS ECDIS900