MARIS ECDIS900 - Type Specific Training Revision: ECDIS Issue No. 1, December 2013 Page 1.

Презентация:



Advertisements
Похожие презентации
© 2006 Cisco Systems, Inc. All rights reserved.CIPT2 v Monitor and Manage IP Telephony Introducing Cisco Unified CallManager Serviceability.
Advertisements

© 2005 Cisco Systems, Inc. All rights reserved. IPTX v Configuring Additional Cisco CallManager Express Features Configuring Cisco CallManager Express.
Reference Feature Power Copy Destination CATPart Copied Feature Reference CATPart PowerCopy Reference Feature Copied Feature Instantiate Link to.
© 2009 Avaya Inc. All rights reserved.1 Chapter Two, Voic Pro Components Module Two – Actions, Variables & Conditions.
© 2003, Cisco Systems, Inc. All rights reserved. CSPFA Chapter 3 Cisco PIX Firewall Technology and Features.
Using Dreamweaver MX Slide 1 Window menu Manage Sites… Window menu Manage Sites… 2 2 Open Dreamweaver 1 1 Set up a website folder (1). Click New…
Computers are a necessary part of modern life. Computers play an important role in the lives of most of us today, whether we realize it or not. Some people,
Copyright 2003 CCNA 3 Chapter 3 Single-Area OSPF By Your Name.
Overview of the Paysonnel CE. Overview Paysonnel CE Go to URL- 1 Click [Login to Paysonnel CE] 2 How to Log-in to Paysonnel CE 1 2.
Dynamic Designer Is the easy way for you to cut as much as 80% from the time and cost of getting your new products to market, and improving the old ones.
WS4-1 PAT328, Workshop 4, September 2004 Copyright 2004 MSC.Software Corporation WORKSHOP 4 POST PROCESSING USING PLOT SET.
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v Complex MPLS VPNs Using Advanced VRF Import and Export Features.
S11-1PAT301, Section 11, October 2003 SECTION 11 ANALYSIS SETUP.
WORKSHOP 20 SINDA TRANSLATION OF A PWB MODEL. WS20-2 PAT312, Workshop 20, December 2006 Copyright 2007 MSC.Software Corporation.
© 2006 Cisco Systems, Inc. All rights reserved. CIPT1 v Administration of Cisco Unified CallManager Release 5.0 Configuring Cisco Unified CallManager.
Sec. 3.4: Find and Use Slopes of Lines. Example Find the slope of each line in the graph. If undefined, write undefined.
WS9-1 PAT328, Workshop 9, May 2005 Copyright 2005 MSC.Software Corporation WORKSHOP 9 PARAMETERIZED GEOMETRY SHAPES.
PAT312, Section 16, December 2006 S16-1 Copyright 2007 MSC.Software Corporation SECTION 16 MATERIALS.
© 2005 Cisco Systems, Inc. All rights reserved. BGP v Module Summary The multihomed customer network must exchange BGP information with both ISP.
WS10a-1 WORKSHOP 10A MODAL ANALYSIS OF A CIRCUIT BOARD NAS122, Workshop 10a, August 2005 Copyright 2005 MSC.Software Corporation.
Транксрипт:

MARIS ECDIS900 - Type Specific Training Revision: ECDIS Issue No. 1, December 2013 Page 1

Revision: MARIS ECDIS900 Issue No. 1, December 2013 Page 2 7. FINAL EXERCISE Balder to Slagen Oil Terminal

Revision: Issue No. 1, December 2013 Page 3 MARIS ECDIS900 – 7.Final Exercise - Balder to Slagen Oil Terminal Task 1: Set data for ship parameters Task 2: Set route parameters.

Revision: Issue No. 1, December 2013 Page 4 MARIS ECDIS900 – 7.Final Exercise Task 3: Create a route Balder to Ferder by keyboard and enter the following waypoints from Balder to Ferder pilot station: Wp 1 LAT N LON E Wp 2 LAT N LON E Wp 3 LAT N LON E Wp 4 LAT N LON E Wp 5 LAT N LON E Wp 6 LAT N LON E Wp 7 LAT N LON E

Revision: Issue No. 1, December 2013 Page 5 MARIS ECDIS900 – 7.Final Exercise Task 4: Create a temporary route for costal navigation with pilot onboard from Ferder pilot station to Slagen Oil Terminal. Name it Slagen in. Use the cursor tool. Task 5: Create a third route - Link two routes: Balder to Ferder and Slagen in. Name Balder to Slagen terminal.

Revision: Issue No. 1, December 2013 Page 6 MARIS ECDIS900 – 7.Final Exercise Task 6: Select ENC (create working folio) for the Balder to Slagen terminal route. Task 7: Create a user data file, name it Slagen in 15 meter, with layers: 1.Parallel index and create one parallel index 2.No Go Areas and create one no go area 3. Go Areas and create one go areas Task 8: Link user data file Slagen in 15 meter to the route file Balder to Slagen terminal. Task 9: Perform route checking and highlight any grounding risk.

Revision: Issue No. 1, December 2013 Page 7 MARIS ECDIS900 – 7.Final Exercise Task 10: Check the weather through the route Task 11: Prepare Voyage plan. Add required information for the whole route. Preparation before departure: Task 12: Check operation of ECDIS. Task 13: Verify and check anti grounding alarm levels Task 14: Activate route and guard zone alarms. Task 15: Activate ECDIS logbook, set interval to 15 sec

Revision: Issue No. 1, December 2013 Page 8 MARIS ECDIS900

Revision: Issue No. 1, December 2013 Page 9 MARIS ECDIS900