Topic:V-Shaped Model Aigerim Arstanova Malika Gumarova Malika Yersainova.

Презентация:



Advertisements
Похожие презентации
The waterfall model is a popular version of the systems development life cycle model for software engineering. Often considered the classic approach to.
Advertisements

The waterfall model is a popular version of the systems development life cycle model for software engineering. Often considered the classic approach to.
While its always a good idea to think outside the box when approaching a creative task, this is not always the case. For example, when working with teams,
2.1 Software development models 1/14 1.Understand the relationship between development, test activities and work products in the development life cycle.
Designing Network Management Services © 2004 Cisco Systems, Inc. All rights reserved. Designing the Network Management Architecture ARCH v
Introducing Cisco Network Service Architectures © 2004 Cisco Systems, Inc. All rights reserved. Introducing the Network Design Methodology ARCH v
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
© 2009 Avaya Inc. All rights reserved.1 Chapter Nine, Voic Pro in SCN Module Two – Centralized Voic Pro.
Introducing Cisco Network Service Architectures © 2004 Cisco Systems, Inc. All rights reserved. Introducing the Cisco AVVID Framework ARCH v
© 2002 IBM Corporation Confidential | Date | Other Information, if necessary © Wind River Systems, released under EPL 1.0. All logos are TM of their respective.
Workshop 11 Imprint - Assembly Meshing Wizard. WS11-2 Assembly Meshing Wizard Design goals One comprehensive user interface Intuitive approach for solid.
Version 1.0 FUP Framfab Unified Process From a technical perspective...
© 2004 Cisco Systems, Inc. All rights reserved. ARCH v Module Summary An enterprise requires its network to be highly available to ensure that its.
FUP Framfab Unified Process Strategic Level Project Level A client team works cross-projects and analyzes the clients situation and develops the clients.
Management Information Systems Systems Development Management Information Systems Systems Development.
PERT/CPM PROJECT SCHEDULING Allocation of resources. Includes assigning the starting and completion dates to each part (or activity) in such a manner that.
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v Module Summary CEF must be running as a prerequisite to running MPLS on a Cisco router. Frame-mode.
Designing Security Services © 2004 Cisco Systems, Inc. All rights reserved. Evaluating Network Security Policies ARCH v
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v Integrating Internet Access with MPLS VPNs Implementing Internet Access as a Separate VPN.
Lesson 15 Steps to Success for Cisco Network Security and VPN Solutions © 2005 Cisco Systems, Inc. All rights reserved. CSI v
Транксрипт:

Topic:V-Shaped Model Aigerim Arstanova Malika Gumarova Malika Yersainova

Vocabulary deliverables-ожидаемые результаты; requirements-требования; adjusting- регулировки; implementation-реализация; sequential-последовательное; execution-выполнение;

The V-Shaped life cycle is a sequential(flowing) path of execution of processes.

When to use the V-model: The V-shaped model should be used for small to medium sized projects where requirements are clearly defined and fixed. The V-Shaped model should be chosen when ample technical resources are available with needed technical expertise.

1.Project and Requirements Planning - the allocation of resources. 2.Product Requirements and Specification Analysis - given the spec of Software. 3.Architecture or High-Level Design - defines how the design responds to the Software. 4.Detailed Design - Development of algorithms for different elements. 5.Production, operation and maintenance - Enhancements and fixes. 6.System and acceptance testing - Environmental Monitoring of Software. 7.Integration and Testing - Module monitoring each connection is correct or not. 8.Unit testing - verify the correct operation of the module is working as planned. 9.Coding - Change is a Software Algorithm