PERT/CPM PROJECT SCHEDULING Allocation of resources. Includes assigning the starting and completion dates to each part (or activity) in such a manner that.

Презентация:



Advertisements
Похожие презентации
The waterfall model is a popular version of the systems development life cycle model for software engineering. Often considered the classic approach to.
Advertisements

The waterfall model is a popular version of the systems development life cycle model for software engineering. Often considered the classic approach to.
SCHEDULE CONTROL CHAPTER 11 Chapters 9 and 10 established a baseline plan and a schedule, respectively for the consumer market study project. Once a.
Work Wonders Пашковская Т.А. Лицей I spend about half of my time in my office, and the other half in court. I don`t have customers. I have clients.
© 2005 Cisco Systems, Inc. All rights reserved. BGP v Customer-to-Provider Connectivity with BGP Connecting a Multihomed Customer to Multiple Service.
Computers are a necessary part of modern life. Computers play an important role in the lives of most of us today, whether we realize it or not. Some people,
What to expect? How to prepare? What to do? How to win and find a good job? BUSINESS ENGLISH COURSE NOVA KAKHOVKA GUMNASUIM 2012.
CHAPTER 9 PLANNING. LEARNING OBJECTIVE This chapter describes techniques used to plan the work elements and activities that need to be carried out in.
Internet as a MODERN WAY OF COMMUNICATION We are glad to present here our project which is called Internet is Modern Way of Communication. It is a very.
The role of information technology in human life.
ORGANIZATION STRUCTURE 1. TYPES Line Organization Functional Organization Line and Staff Organization Project Organization Matrix Organization 2.
Designing Network Management Services © 2004 Cisco Systems, Inc. All rights reserved. Designing the Network Management Architecture ARCH v
RLC circuit. An RLC circuit (or LCR circuit) is an electrical circuit consisting of a resistor, an inductor, and a capacitor, connected in series or in.
DRAFTING TECHNIQUES I 136. Here is a basic shape. From here, we will do some advanced drafting once we put this shape on a sheet as a drawing. Select.
A Bill is a proposal for a new law, or a proposal to change an existing law that is presented for debate before Parliament. Bills are introduced in either.
Imagine what it is like to be an army tank driver. You must be very alert. You must be able to react quickly when under fire and drive the vehicle carefully.
THE MEDIA The mass media play an important part in our lives. Nowadays information is the most necessary thing. That is why there are so many sources.
МОУ «Корочанская СОШ им. Д.К. Кромского». Every society has lots of common ways and problems.
Sequences Sequences are patterns. Each pattern or number in a sequence is called a term. The number at the start is called the first term. The term-to-term.
Centrifugal force (rotating reference frame). Centrifugal force (from Latin centrum "center" and fugere "to flee") can generally be any force directed.
Транксрипт:

PERT/CPM

PROJECT SCHEDULING Allocation of resources. Includes assigning the starting and completion dates to each part (or activity) in such a manner that the whole work (or project) proceeds in a logical sequence and in an orderly and systematic manner.

OBJECTIVES OF SCHEDULING To minimize cost of production and storage. To maintain minimum cash outflow. Maximum/effective utilization of resources. Maximum plant utilization. To ensure maximum customer satisfaction.

PERT Program Evaluation and review technique Time-event network analysis in which the various events in a program or project are identified, with a planned time established for each. These events are placed in a network showing the relationships of each event to the other events.

PERT Each circle represents an event. Circles are numbered in the order in which the events occur. Each arrow represents an activity- the time consuming element of a program. Activity time represented by the number between the arrows, is the time required to accomplish an event.

PERT In this example, only a single time is shown for each activity, but in the original PERT program there were three time estimates. Optimistic time: an estimate of the time required if everything goes extremely well. Most likely time: an estimate based on the time the project engineer really believes is necessary for the job Pessimistic time: a time based on the assumption that some logically conceivable bad luck, other than a major disaster, will be encountered. These estimates are often included in PERT because it is very difficult, in many engineering and development projects to estimate time accurately.

ADVANTAGES OF PERT Forces managers to plan because it is impossible to make a time-event analysis without planning and seeing how the pieces fit together. Forces planning all the way down the line because each subordinate manager must plan the event for which he or she is responsible. Concentrates attention on critical elements that may need correction. Enables managers to prepare reports.

LIMITATIONS OF PERT Emphasis on time not costs. Not useful when estimates of time cannot be made.

CRITICAL PATH METHOD Sequence of events that take the longest time and that has zero(or the least ) slack time. Critical path comprises events Over this path, the activity time for this sequence of events is weeks. If promised delivery is in 135 weeks, even this critical path will have been completed 3.4 weeks ahead of time.

CRITICAL PATH METHOD Some of the other paths like are almost as long as the critical path = 129 weeks It is customary to identify several critical paths in order of importance. Identifying the CP makes possible close monitoring of this particular sequence of events to ensure that the whole program is on schedule.